Always consult a licensed electrician before working on your home’s electrical system ~Norwall PowerSystems

Connecting the Main Utility Supply

Route the two colored hot wires neatly through the transfer switch box to the utility supply breaker and trim them to length. Strip the insulation back 1/2 inch from the wire ends and insert them into the lugs. Torque the lug screws according to the manufacturer’s specifications.

Most traditional portable genertors with a 30-amp or 50-amp outlet for connection to an inlet box and manual transfer switch have a bonded neutral. For this reason, the transfer switch should switch the neutral. The HomeLink 30-amp and 50-amp manual transfer switches and kits sold by Norwall are switched-neutral switches.

Portable Generator Grounding—When and How to Ground Your Generator

Route the white neutral wire to the neutral lug. Trim the wire to length, strip the end and insert it into the lug. Torque the lug screw according the transfer switch instructions.

Route the green or bare ground wire to the ground bus, trim and strip it, and connect it to the ground bus. Torque the lug screw per the transfer switch instructions.

Portable Generator Safety Rules To Live By

Main Circuit Breaker Panel to Manual Transfer Switch Wiring Guide. For Illustrative Purposes Only. Follow the Instructions and Wiring in your Manual Transfer Switch Installation Guide.

Transfer Switch Wiring drawing showing the main panel and transfer switch panel with labels and where to make connections.

1. Main Circuit Breaker (may be absent when the panel has an external disconnect)
2. Neutral Bus Bar.
3. Neutral Wire (white).
4. 50-Amp or 30-Amp Double Pole Breaker connects to Transfer Switch Utility L1 & L2.
5. L1 & L2 Wires.
6. Main Panel Ground Bus and Ground Wire to Transfer Switch.

7. Utility and Generator Line Connections. (Utility top row, Generator bottom row, in illustration above L1, L2, & N.
8. Transfer Switch Ground Bus
9. Transfer Switch Neutral Bus
10. Transfer Switch Circuit Breakers

Connecting the Branch Circuits

For each circuit that will receive generator power, disconnect the wire from the circuit breaker in the main service panel. Strip the end of the wire to 3/4 inches and twist the bare end together with a new length of the same gauge and color wire using a lineman’s pliers. Complete the connection by twisting on a wire nut.

Feed the new wires through the conduit to the transfer switch and connect them to the correct size breaker in the manual transfer switch. Route the wires neatly.

Buyer Guide: What Size Generator Do I Need?

The transfer switch ground wire that connects to the main distribution panel’s ground bus uses the home’s existing grounding electrode to ground all the electrical circuits and also connect the generator’s equipment ground to the home’s grounding electrode. It is unnecessary to move individual circuit ground wires to the transfer switch ground bus.

Locate the neutral wire for each circuit in the manual transfer switch. Disconnect the white neutral wire from the neutral bus and extend it to the transfer switch neutral bus. Extend neutral wires using the same connection method as for the hot wires.

Important: It is not uncommon for neutral and ground wires in the main circuit breaker panel to use the same bus. This is not allowed in the transfer switch. Ground and neutral must remain separate in the transfer switch panel.

How to Use a Portable Generator During a Power Outage

Connecting the Inlet Box

Pull the four generator wires, L1, L2, N, and G, through the conduit from the inlet box to the manual transfer switch. In the transfer switch, neatly route the hot wires L1 and L2 and the Neutral N wire to the generator breaker, and the ground wire to the ground bus. Trim to length and strip the wire ends.

  • Connect L1 to the Generator L1 Lug
  • Connect L2 to the Generator L2, lug.
  • Connect N to the Generator N lug.
  • Connect G to the Transfer Switch Ground Bus.

Torque all lug screws to the transfer switch manufacturer specifications.

Do not cut the wires too short in the inlet box. Each wire should extend into the box at least 8 inches, but not so long they overcrowd the box.

  • Connect L1 and L2 to the terminals labels X and Y.
  • Connect the ground wide to the G terminal.
  • Connect the neutral wire to the N terminal.

Torque all connections according to the instructions.

Portable Generators for Sale

Finishing the Installation

Replace the cover on the main service panel. Write the name of each circuit on the transfer switch circuit list for future reference. Replace the manual transfer switch cover, and the inlet box cover.

In the main panel, set the 30-Amp or 50-amp transfer switch circuit breaker to the “ON” position. Set any circuit breakers no longer used to the “OFF” Position.

Portable Generator Sizing Guide

Testing

Move the transfer switch to the utility supply. Set the main breaker in the main circuit panel to the ON position. All circuits should be functioning normally.

Set the transfer switch to Generator. The circuits served by the transfer switch should stop working.

Simulate an Outage

Set the transfer switch back to utility. Set the main circuit breaker to OFF. Nothing in the house should have power.

Connect the generator to the inlet box with the generator cord. Start the generator and allow it to warm up for a minute.

At manual transfer switch, set all the circuit breakers to off. Move the Genertor-Utility switch to Generator. Turn on the circuit breakers one at a time starting with the heaviest load. Give the generator a few seconds to adjust after adding a heavy load.

After all circuit breakers are on, the circuits served by the manual transfer switch are working. The rest of the house does not have power. This simulates a power outage—transfer switch circuit breakers have power, main panel circuit breakers do not have power.

Congratulations. You are ready to call for your final inspection. Be ready to hook up your generator for the inspector—they will want to see everything working and do their own tests.

Updated July 3, 2026